Correctional Facility in Kiel – Extension

The minimum security prison project is for a completely cellared residential building for the facility. The sanitary and detention facilities are located on the ground floor and the two floors above. The technical installations were completely renewed. New storage and technical facilities were built in the basement.

The reconstruction of the training area in the main building consisted of the dismantling and reconstruction of individual supply facilities and the construction of new sanitary facilities. The rooms have been adjusted for present usage. A connection to the ventilation system was set up for the storage room of the laundry in the basement.

The showers and kitchenettes and their supply installations were transferred due to the extension of the training area in the main building. The district heat delivery system has been adapted for the future needs of the property. The existing hot water system was transferred and optimized in its technical regulation.

You might also be interested in