CAU in Kiel – Renovation of the Institute of Anatomy

The anatomy section of the CAU Kiel was equipped with new medical – laboratory equipment, escape and escape routes, as well as a new extension as a preparation area. The facilities with technical equipment were also modernized. The renovations took place during full operation, so that the lectures and research would be unaffected. This required precise scheduling and resulted in a longer construction period. Due to the storage of high quantities of alcohol in the new extension, extra attention had to be paid To observing the explosion protection requirements. An automatic alcohol recovery system was also designed and implemented in order to reduce operating costs.

You might also be interested in