CAU Kiel Renovation of the Institute for Biochemistry

The technical building equipment systems were modernized during the refurbishment of the institute for biochemistry. In addition, the laboratory facilities and the media technology were renewed in the classroom facilities. The renovations were performed during full operation so that the lectures and research could continue undisturbed. This required a well-thought-out scheduling and a prolonged period of construction. The planning and implementation of various restorations and interim measures were required.

You might also be interested in