Julius Leber Barracks Renovation of the Economic Building

To supply this and the Fliegerhorst barracks a troop kitchen was added for 1,200 meal participants in the existing buildings. For a shorter construction period, container facilities were set up and expanded. The five ventilation systems have been set up in the attic. The heating and drinking water supply is carried out from the technically expanded basement. Also increased prevention – and safety-related aspects have been implemented due to the facilities classification as a meeting place.