Janssen-Cilag GmbH Renovation and Optimization of Technical Building Systems

Here we renovated the ventilation, the measuring and automatic control systems and the heat supply systems. All state of the art in the context of adapting to current demand and energy optimization, of course in compliance with the hygiene requirements. Renewal and reconstruction of the technical building systems were made in administration and in the high-bay warehouse and storage warehouses without interrupting company operation. DDC automation stations were installed, as well as establishing and fitting a parent central control system. A completely new low voltage main distributor system was installed during operation in the energy centre as well as optimally laying out and if necessary replacing the property’s complete cable network designed complements. Appropriate provisional solutions had to be considered.